The problemWhy do modular plants lose information between sale, line and site?
A module is sold in one tool, drawn in another, built from a paper traveler, labelled from a binder and invoiced from a spreadsheet. Every handoff is a chance to lose a change, a signature or a payment.
01
Changes arrive after the design is frozen
A late drawing revision reaches the floor without a change order, so nobody prices it and the schedule slips quietly.
02
Sign-offs live on paper
Hold points, failed checks and NCRs sit in binders. When an inspector asks who signed a check and when, someone goes looking.
03
Billing is disconnected from production
Payment milestones depend on design lock, production and delivery, but the people invoicing cannot see the line.
Modular OS keeps one record per module and one record per project, so each of those handoffs is a recorded step, not a phone call.